Process Solutions

Complete flowsheets, not just machines. Whether your gold sits in hard rock, river gravel or a cyanide circuit — we design the line, supply every machine and commission it as one accountable package.

01

Hard-Rock Line — Crush, Grind, Leach

For primary and oxidized hard-rock deposits: single-stage jaw crushing into a ball-mill grinding circuit, sized to your throughput from 1 to 500 t/d. Where the ore needs cyanide, the grinding product feeds a full CIL plant; where it does not, gravity and flotation recover the gold instead.

We match every stage to your ore test results — crusher closed-side setting, mill media charge, cyclone or screen classification — so the plant starts at the recovery the ore allows.

  • 1–500 t/d Capacity
  • Jaw & Cone Crushing
  • Ball Mill Grinding
  • Gravity / Flotation / CIL
  • Full Commissioning

Hard-rock flowsheet

Run-of-Mine Ore↓
Jaw Crusher → Cone (optional)↓
Ball Mill + Classification↓
Gravity / Flotation Concentrate↓
CIL Leaching of Tailings↓
Gold Bullion
02

Alluvial Recovery — Wash & Gravity

For river and terrace placers: a trommel washes and sizes the gravel, then centrifugal concentrators catch the fine gold that sluices lose, and shaking tables finish the concentrate. Mercury-free, modular, and sized from 5 to 150 t/h.

On waterways the same logic floats — sand suction vessels wash and recover on the river itself, cutting rehandling to zero.

  • 5–150 t/h Capacity
  • Trommel Washing & Sizing
  • Centrifugal Concentration
  • Table Finish
  • Mercury-Free Route

Alluvial flowsheet

Gravel Feed / Dredger Suction↓
Trommel Wash & Screen↓
Centrifugal Concentrator↓
Shaking Table Finish↓
Gold Concentrate
03

CIL / CIP — Cyanide Leaching Lines

Complete carbon-in-leach and carbon-in-pulp plants from 100 to 1,000 t/d: leaching tanks, interstage safety screens, desorption and electrowinning, carbon regeneration and gold smelting — with the stainless process piping and spares an operating cyanide circuit lives on.

Every line is engineered from your ore's grind size, clay content and gold grade, then quoted with a fixed equipment list and installed with our team.

  • 100–1,000 t/d Lines
  • Leaching & Adsorption Tanks
  • Desorption & Electrowinning
  • Carbon Regeneration
  • Smelting & Bullion

CIL flowsheet

Ground Slurry (95% −200 mesh)↓
Leach + Carbon Adsorption↓
Safety Screens → Loaded Carbon↓
Desorption & Electrowinning↓
Smelting↓
Gold Bullion

Tell us about your deposit

Send ore type, grade and daily tonnage — we will return the right flowsheet and a factory-direct equipment list for it.

Get a Process Design